(top gray line)

INfomobility Services for safeTy-critical Applications on Land and Sea based on the use of iNtegrated GNSS Terminals for needs of Olympic cities

 

INStANT WebSite

email to:

INStANT@next.it

 

2nd Review Meeting (Rome 18/09/03)

MM_INSTANT_WP1_NXT_2ndREV

Minutes of meeting

INStANT_Review_Agenda   

Agenda

 

 

 

Management status    

Milestone objectives
Results of the second phase

Project status    

Management Report summary
Task status and planning

Project schedule

State-of-Art/Regulatory issues    

SOC status and update

Site Survey: Overall

Site Survey: Post-processing    

Site Survey: Pilot 1

Site Survey: Pilot 2 and 3    

Site Survey improvement
Pilot 1: Urban Environment
Pilot 2: Maritime Environment
Pilot 3: Semi-urban Environment

Engineering process    

Adopted SE methodology and status

User Requirements    

URD: overall merging

System Requirements    

SRD: status and approach

Architectural Design    

ADD: status and approach

System Infrastructure    

Infrastructure and major components

Demonstration    

INStANT Release 3, Demonstration and man machine interfaces

Top

 

 (bottom gray line)

Copyright © 2001. NEXT SpA. All rights reserved.